VFD Yellow Rack And Pinion Hoist Engine Power 2x15Kw For Construction Man / Materials

Place of Origin CHINA
Brand Name KANGBO
Certification TUV
Model Number SC200/200(BD), KP-B07, B08
Minimum Order Quantity 1 Unit
Price Negotiate
Packaging Details Suitable for export
Delivery Time In 30 days after receipt of L/C, T/T
Payment Terms L/C, T/T
Supply Ability 150 units per month

Contact me for free samples and coupons.

WhatsApp:0086 18588475571

Wechat: 0086 18588475571

skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material Q355B Cool Roll Steel Plate Finish Sand Blasting And Painted, Galvanised
Color Yellow Purpose Vertical Transportation In Construction
Type Rack And Pinion Hoist Standard EU Regulations
Description Material & Passengers Elevators Motor Control FC (Frequency Control)
Highlight

rack and pinion elevator

,

rack & pinion hoist

Leave a Message
Product Description

Rack and Pinion Hoist Lifts for Construction Man and Materials VFD, KP-B07, B08

 

Features

Motors are FC controlled make the lifts start/stop smoothly.

Reliable and long work life. 
Adopt Schneider inverters.
Flap Type Exit Door as loading/unloading ramp are availble.
Strengthened lifts car frame, extremely strong cage make the lifts durable.
Lifts car roof made of steel plates and the edges are totally welded.


Production
Main steel channel of the cage frame are enlarged and thickened.

Cage roof edges are totally welded by robots.
Main steel structure parts are made of cold rolled steel plates and processed by CNC machines in tool fixtures.

 

Technical Data 

Item KP-B07, KP-B08
Payload capacity 2,000 kg
Lifting speed 0–46 m/min.
Max. lifting height 250/400 m*
Cage width (internal) 1.5 m
Cage length (internal) 3.2 m
Cage height (internal) 2.35 m
Motor control FC control
Engine power 2x15 kw each cage
Gearbox Helical Reducer
Safety device type Centrifugal Brake
Power supply range 380–500 V, 50 or 60 Hz, 3 phase
Mast Section Square Column 650*650*1508 mm with bolted rack
Rack module 8
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer.

 

VFD Yellow Rack And Pinion Hoist Engine Power 2x15Kw For Construction Man / Materials 0