Intelligent Control Steel Construction Rack And Pinion Lift System

Place of Origin CHINA
Brand Name KANGBO
Certification TUV
Model Number SC200/200
Minimum Order Quantity 1 unit
Price Negotiate
Packaging Details Suitable for export
Delivery Time 30 days
Payment Terms T/T, L/C
Supply Ability 150 sets per month

Contact me for free samples and coupons.

WhatsApp:0086 18588475571

Wechat: 0086 18588475571

skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Hoisting Equipment In Construction Material Q345B Cool Roll Steel Plate
Application Construction Site, Plants, Etc. Production Processed By CNC Machines, Laser, Robots In Assembly Line.
Color Multi Colored Control Intelligent Control
Highlight

Intelligent rack and pinion lift

,

steel rack and pinion lift

Leave a Message
Product Description

Intelligent Control Steel Hoisting Equipment In Construction

 

Hoisting Equipment In Construction Features


* Drive devices and cages are generic and interchangeable.
* Apply helical gearaboxes
* Centered racks to reduce Partial load torque of the machine and make it run more stably and smoothly.
* Flap door as loading/unloading ramp is availble.
* Easy access to electrical panels.

 

Hoisting Equipment In Construction Design


It is the truly modular rack and pinion hoist design, so the elevator drive devices and cars are generic and interchangeable.

 

Hoisting Equipment In Construction Features and Advantages

 

The modular and standardizing system makes the Kangbo construction elevators be flexible, efficient, safe, productive, low energy consumptive and ownership cost, making them the best choice for both construction and rental companies.

Adopt energy-saving helical reducers made specially for rack and pinion elevators, extremely strong, reliable and durable.
Racks centering at mast reduce partial load torque of builders hoists, makes the construction hoists run more stably and smoothly.
Applying non-eccentric rollers, make the installation of construction site elevators be faster and easier, with much less error.

 

Hoisting Equipment In Construction Parameters

 

Technical Data KP-B07, B08
Payload Capacity 2,000 kg
Lifting Speed 0–46 m/min.
Max. Lifting Height 250/400 m*
Cage Width (internal) 1.5 m
Cage Length (internal) 3.2 m
Cage Height (internal) 2.35 m
Motor Control FC control
Engine Power 2x15 kw
Gearbox Helical Reducer
Safety Device Centrifugal Brake
Power Supply Range 380–500 V, 50 or 60 Hz, 3 phase
Mast Section Square column 650*650*1508 mm with bolted rack
Rack Module 8
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer.

 

Intelligent Control Steel Construction Rack And Pinion Lift System 0