3 Doors Bridges Chimney Rack Pinion Construction Site Lift

Place of Origin CHINA
Brand Name KANGBO
Certification TUV, CCC
Model Number Construction Site Lift SC200BD MP-B05 SC200-200BD MP-B06
Minimum Order Quantity 1 set
Price Negotiate in USD
Packaging Details Export package
Delivery Time 25-30 days
Payment Terms T/T, L/C

Contact me for free samples and coupons.

WhatsApp:0086 18588475571

Wechat: 0086 18588475571

skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Keywords Construction Site Lift Doors 3 Doors
Design According To European Standard. Truly Modular Material Q345B
Production As Per European Regulation EN 12159:2012, EN 60204-1:2006/A1:2009. Color Yellow
Highlight

Bridges rack pinion lift

,

Chimney rack pinion lift

Leave a Message
Product Description

3 Doors Bridges / Chimney Construction Site Lift

 

Construction Site Lift Application

 

Hoist can be used on various building for material or passanger lifting and transport, such as residential, industrial and commercial super high building, power plant and bridge. With more than 10 years experience of our team,we has delivered many successful projects. We offer customize solutions to meet various purpose use, such as ultra high speed, twin or four masts, lean or curve mast and platform hoist.

 

Construction Site Lift Standard Configuration


There is a electrical small crane available to facilitate the assembly of the construction elevator.
There is the additional 'C' door at cage side for convenient loading/unloading.
Available in single or twin hoist cage configuration.
The construction rack and pinion elevators are Variable Frequency Drive (VFD), with low starting current and much less wear and tear, very smooth starting and stopping.
Manual or Automatic Controls of the hoist is optional.
There is LED lighting inside construction elevator car.

 

Construction Site Lift Technical Data

 

Item & Article No. SC200BD, MP-B05; SC200/200BD, MP-B06
Payload Capacity 2,000 KG per Cage
Lifting Speed 0–36 m/min.
Max. Lifting Height 450 m
Cage Size (internal) 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Cage Doors 3 doors, Entry Door + Exit Door + Side Door
Motor Control FC (Frequency Control)
Engine Power 2x11 KW per Cage
Gearbox Helical Gearbox
Safety Device Type Centrifugal Brake
Power Supply Range 380–500 V, 50 or 60 Hz, 3 Phase
Type of Mast Square Column 650*650 mm with Bolted Rack
Length Mast Section 1.508 m
Rack Module 8

 

3 Doors Bridges Chimney Rack Pinion Construction Site Lift 0