EN 12159 2012 Lifting 36 M / Min Construction Material Hoist

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Construction Material Hoist | Lifting Speed | Lifting Speed 0–36 M/Min |
---|---|---|---|
Design | According To European Standard. Truly Modular | Material | Q345B Steel |
Production | As Per European Regulation EN 12159:2012, EN 60204-1:2006/A1:2009. | Color | Yellow |
Highlight | 36m / min Material Hoist,36m / min Construction Hoist |
EN 12159:2012 Lifting Speed 0–36 M/Min Construction Material Hoist
Construction Material Hoist Main parts :
1. Guide rail system
The SC series construction hoist for materials and passengers CE and ISO approved is equipped with the guide rail system made of 20# steel that is 4.5mm thick.
2. Gear rack
The gear rack is made of 55# steel and its service life is about 10 years.
3. Power system
Same as the engine of a car, the elevating conveyor is the core part of an elevator. The housing is made of 104# GB aluminum to avoid any cracking. The 94# tin bronze is used to produce the worm gear. Other parts like the worm and fluted disc are made of 38# chrome green aluminum. Except the bronze worm gear, all other parts aforementioned should experience heat treatment, blackening and coating. The operating time of the construction hoist is 10 to 15 years.
4. Safety devices
a. Fall arrest device
b. Loading capacity limiter
c. Limit switch
d. Upper limit protection device
e. Lower limit protection device
f. Door limit protection device
g. Escaping window limit protection device
h. Bell warning device
i. Emergency stop protection device
j. Buffering protection device
k. Motor overload protector
l. Transformer short-circuit protection device
m. Phase sequence protection device
n.hydraulic self –service skylight ,continent and air-tightness is better
o.other safety door supplied to allow operator come in only
p. self serve tanker ,convenient and easy
q.”s”type door for material ,easy to operate
r.PLC control system ,status of working can be showed and convenient to check the problem
5. Cable
We employ genuine GB cable that is guaranteed on quality.
6. Electrical system
The main devices in the electrical system are all imported.
a. The fan installed helps dissipate the heat effectively.
b. With a time delay relay, the construction lift can stop smoothly and steadily.
c. Alarm bell informs users of the starting of the fall arrest device.
d. Failure warning light will send light signals when there is a failure of the motor or electrical system.
7. Protection fence
The outside fence and fence gate are built with plastic-sprayed perforated plate
8. Additional scaling ladder
For each construction hoist, two scaling ladders are added to the drive system to ensure more convenient and flexible installation.
Construction Material Hoist Technical Data
Item & Article No. | SC200BD, MP-B05; SC200/200BD, MP-B06 Construction Material Hoist |
Payload Capacity | 2,000 KG per Cage |
Lifting Speed | 0–36 m/min. |
Max. Lifting Height | 450 m |
Cage Size (internal) | 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage |
Cage Doors | 3 doors, Entry Door + Exit Door + Side Door |
Motor Control | FC (Frequency Control) |
Engine Power | 2x11 KW per Cage |
Gearbox | Helical Gearbox |
Safety Device Type | Centrifugal Brake |
Power Supply Range | 380–500 V, 50 or 60 Hz, 3 Phase |
Type of Mast | Square Column 650*650 mm with Bolted Rack |
Length Mast Section | 1.508 m |
Rack Module | 8 |