Sand Blasting Construction Hoist Elevator Payload Capacity 2000Kg FC Control

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xItem | Construction Hoist Elevator Rack And Pinion SC200/200(BZ) KP-B07, B08 | Work Mode | Mast Climbing |
---|---|---|---|
Purpose | Vertical Transportation Of Man And Materials In Construction Site Or Building | Material | Q355B Cool Roll Steel Plate |
Finish | Sand Blasting And Paint/Galvanised | Color | Yellow |
Highlight | Sand Blasting Construction Hoist Elevator,FC Control Construction Hoist Elevator,2000Kg Rack And Pinion Elevator |
Construction Site Elevator Rack and Pinion Type SC200, SC200/200 KP-B07, B08
Standard Configuration
Available in single or twin hoist cage configuration.
Frequency control makes the construction hoists starting and stopping very smoothly, with low starting current and much less wear and tear.
Manual or Automatic Controls of the hoist is optional.
High efficiency gearboxes and frequency control motors.
Lighting inside construction elevator car is LED ceiling lamp
Optional Configuration
* Flap type exit door of rack and pinion elevator cage as loading/unloading ramp is available.
* Multi-functional Control, including Floor selection, Automatic Start/Landing, Error Detect and Display, etc. is available.
* Sliding Contact Line (Busbar) power supply system is available.
Technical Data
Model | SC200, KP-B07; SC200/200, KP-B08 |
Payload Capacity | 2,000 kg |
Lifting Speed | 0–46 m/min. |
Max. Lifting Height | 450 m |
Cage Width (internal) | 1.5 m |
Cage Length (internal) | 3.2 m |
Cage Height (internal) | 2.35 m |
Motor Control | FC control |
Engine Power | 2x15 kw |
Gearbox | Helical Reducer |
Safety Device | Centrifugal Brake |
Power Supply Range | 380–500 V, 50 or 60 Hz, 3 phase |
Mast Section | Square column 650*650*1508 mm with bolted rack |
Rack Module | 8 |